Solar Energy Systems In Romania
We offer you 2 options for Solar Energy System investments in Romania.
Option 1
The investor can buy land. Lands generally have field status. Afterwards, the person can apply for the license by obtaining the necessary construction and similar permits from different state ministries. In this conditions
1- The difference in m2 prices of land in the southern and northern regions varies between 1.5-2 euros.
2- The radiation rate in Romania is between 1600 and 1800. Since this rate is higher than Germany and many other countries, the investment rate in Romania is quite high.
3- Construction permits etc. take an average of 1 to 3 months.
4- After the permits are obtained, it takes 1 to 1.5 years for the solar system license to be approved.
5- The connection fees to be paid to the state are notified to the investor 3-2 months before the license is approved. This fee is paid to the state as a transportation fee. It is determined according to the electricity carrying capacity in the project area. For this reason, it is not known exactly when the land is purchased.
Option 2
It is transferred to the investor as a company, with all permits, including investor license and construction permit, obtained.
1- The investor can start the installation of the solar energy system without losing any time for permits.
2. Connection fees have been determined.
3- Average turnkey prices per MW in Romania are 150-200,000 Euros cheaper than in Germany and many other countries.
4- Radiation rates in Romania are higher than other countries.
5- Below is the land information that can be obtained immediately on a licensed MW basis.